The old terracotta tiles came off section by section and were replaced with a dark metal roof, with every dormer, valley and junction re-flashed to suit.
Scaffolding went up around the full perimeter so the crew could work the steep pitches safely, and the home stayed weathertight from strip-out to final sheet.
Drag the slider to compare the roof mid-way through the job with the finished result.

DuringAfterStrip-out, scaffold and sheeting — a look at the job underway.
Tap any photo to view it full size.
Tell us a little about the job and we'll be in touch to book an onsite assessment — usually within one business day.